Line Balance Lab
Match people, steel, and know-how across upstream, downstream, and QC so the line flows. Grow capacity in balance — cash clears at release. Same craft as real scale-up; built to play in a few minutes.
Line Balance Lab
Balance USP → DSP → QC. Cash arrives only after release (~$175k).
How Line Balance Lab works
- Batches flow Upstream → Downstream → QC. Revenue lands on release.
- Throughput follows the tightest bottleneck (equipment ∩ staff).
- Develop a stage to raise its success rate; train to cut deviations and heat.
- Expand capacity in balance — idle steel still burns OpEx.
- Two endings: bankruptcy ($0) or consent decree (heat 100).
Cash
$1.05M
Time
0:00
Released
0
Pool
0 free
Pilot stableClinical capableCommercial ready
Bottleneck
Upstream
75% success · 1 open slot
Staff on floor
1
Suite idle
Cap 1 · Tech L0 · next develop $90k
Add Upstream capacity → relieve bottleneck
Downstream
85% success · 1 open slot
Staff on floor
1
Suite idle
Cap 1 · Tech L0 · next develop $90k
Develop Downstream → higher yield
QC / Release
90% success · 1 open slot
Staff on floor
1
Suite idle
Cap 1 · Tech L0 · next develop $90k
Develop QC / Release → higher yield
Plant online. Balance USP → DSP → QC — bottleneck and heat both kill.
When the line gets real
BiOS runs a fixed-fee Operational Scale-Up Assessment ($4,500 · ~10 business days) that delivers a working scale-up decision tool customized to your situation — not only a PDF, and not another open retainer. Line Balance Lab is live here; a full customer portal is not.